Skip to content
Honeydew Energy Advisors
Region
Jurisdiction
Services
Home / Regions / San Francisco / Benchmarking
Energy benchmarking in San Francisco

San Francisco energy benchmarking, filed properly and on time.

If your building is covered, you owe an annual energy filing to the City of San Francisco. We collect the utility data, build the record, and file it, and we tell you early if the building was never covered at all.

No obligation. We will tell you if you do not need us.
What San Francisco requires
Who is covered 10,000 sq ft, non-residential The lowest threshold we work with anywhere. City filing satisfies the state programme.
Annual deadline May 1, annual Commercial energy audits run on rolling five-year per-building dates.
What is measured Energy Reported to the city, which satisfies the California state programme.
Filed with the City of San Francisco Filed with the City of San Francisco.

Dates and thresholds change. We confirm the current requirement for your specific building before anyone acts on it.

What the filing is, and what makes it hold up.

Benchmarking is a measurement exercise. Once a year you report whole-building energy use, floor area, and how the space is used. It does not by itself require you to change anything about the building.

What it does is set the number every later obligation runs on, from your performance position to the questions lenders and appraisers ask. A filing made with the wrong square footage or a missing meter quietly becomes a compliance problem a year or two later.

There is no third-party verification requirement here today, which means the quality control on the record is ours to own rather than a regulator’s to catch.

Local detail that changes the answer
A 10,000 sq ft threshold
Non-residential coverage starts far lower here than almost anywhere else, so small buildings are frequently covered.
PG&E gates both fuels
One attestation covers the whole property, and until it is in place nothing moves. There is no partial-fuel start.
A 2030 renewable requirement
Commercial buildings over 50,000 sq ft face a 100 percent renewable electricity obligation, which is a supply planning question.
The services behind this page

How we get you compliant

The same sequence every time, tuned to what San Francisco actually asks for.

1
Confirm coverage
Threshold, building definition, and whether the property is genuinely covered. Occasionally the answer is that it never was, and we say so.
2
Get the data flowing
The PG&E attestation is the critical path, because it gates both fuels. We start it first and build the schedule around it.
3
Build the record
Property setup with verified floor area and complete meter coverage, structured so next year is easier than this year.
4
File and confirm
Submitted to the City of San Francisco, confirmed received, and documented for your files.
5
Watch the trend
Your position against the San Francisco audit and renewable requirements comes out of this data, so we review the trend while there is still time to influence it.
If the filing is late

Three layered obligations and one utility gate.

San Francisco combines a very low reporting threshold, a rolling audit cycle, and a 2030 renewable electricity requirement for larger commercial buildings. Each one has a different clock.

All of them depend on utility data, and because PG&E serves both fuels the attestation is the first thing we do rather than something we get to.

Received a letter?

What a San Francisco notice usually means.

San Francisco letters are usually about one of three obligations.

Send us the letter
Benchmarking non-compliance
The May 1 annual report is missing. Coverage starts at 10,000 sq ft for non-residential, which catches buildings that assume they are too small.
Audit or renewable electricity notice
A commercial audit is due on your rolling date, or the 2030 renewable electricity requirement is being flagged for a larger commercial building.

Send us the letter itself, not a summary. We read it for the six things that decide the response: who sent it, which building and identifier it names, what period it covers, what it says you failed to do, the cure date, and whether it is a first notice or an escalation. We never quote a running penalty total, and we cure first, then talk to the regulator.

Why owners hand San Francisco to Honeydew

We file across twenty-six jurisdictions and track the rule changes in each one rather than working from last year’s version.

We read the primary sources
Twenty-six jurisdictions, each with its own portal, deadline and enforcement style. We work from the ordinance, the regulator’s FAQ and the covered building list, not from last year’s memory.
Credentialed
Certified Energy Manager on staff, Portfolio Manager specialists, and the credentials the verification work requires.
Built for boards
Most of our clients are condo and co-op boards and the managers who serve them. We present in plain English, on your meeting schedule.
One accountable partner
We are not engineers and we do not pretend to be. We manage the process, coordinate the right vendors, and own the outcome.
Owners and managers we work with
FirstService Residential Legum & Norman EJF Real Estate Services Comsource Management Barkan Management Howard University Regency Centers Montgomery County Green Bank

San Francisco benchmarking questions

Coverage here turns on floor area from 10,000 sq ft for non-residential buildings, which is the lowest threshold in our book. Send us the address and we will confirm it against the jurisdiction’s own records rather than estimating.

Annual reporting is due May 1, and commercial audits fall on rolling per-building dates rather than a single city-wide year.

Yes, a city filing satisfies the California state programme. An exemption does not, which is the same trap as Los Angeles.

As a supply question. It is solvable with planning and expensive as a last-minute scramble, so it belongs in the capital and procurement conversation now.

Keep reading

The pages that usually matter next for a San Francisco building.

Performance standard BEPS in San Francisco The performance standard, the pathways, and what the exposure really is. Everything we do here Full services in San Francisco Everything Honeydew manages here, compliance and energy services together.
What is BEPS? All Honeydew services Every region we serve Latest rule changes on the blog

Send us the address, we will confirm what you owe.

One short call establishes whether you are covered, what is outstanding, and what closing it out costs.

202-670-9625 Send us the address
Start with the building

Tell us what is on your plate. We will help you sort it out.

A notice, a deadline, a portfolio, or simply a question. You do not need to have it organized before you call.

202-670-9625
Monday to Friday, and yes, a person answers.

Thank you. It is on its way.

Your request has been saved. An advisor will reply, usually the same business day.

Send us the details

Everything here is optional except a way to reach you.

Goes to [email protected]. We do not share your information or sell it to vendors.

Privacy choices

Choose which optional tools may run. Contact forms and our standard phone number remain available.

Privacy details