Skip to content
Honeydew Energy Advisors
Region
Jurisdiction
Services
Home / Regions / San Francisco / Full services
Honeydew in San Francisco

Everything we manage for a San Francisco building.

Compliance is how most clients meet us. Verification, supply where the market allows it, solar screening and bill auditing are why they stay.

No obligation. We will tell you if you do not need us.
What we run in San Francisco
Compliance Benchmarking and the San Francisco audit and renewable requirements 10,000 sq ft, non-residential, filed with the City of San Francisco.
Deadline May 1, annual Commercial energy audits run on rolling five-year per-building dates.
Verification Not required today We still verify floor area, because every metric here is per square foot.
Energy supply Regulated market No retail choice here, so the savings work is efficiency, incentives and bill auditing.

Dates and thresholds change. We confirm the current requirement for your specific building before anyone acts on it.

How the pieces fit together in San Francisco.

A covered building in San Francisco is dealing with an annual filing, a set of local rules that change more often than anyone expects, and a capital plan that has to satisfy an owner or a board. Handled separately, those generate vendors who do not talk to each other.

We are the accountable partner across all of it. We are not engineers and we do not pretend to be. We make sense of the rules, verify the data, bring in the right specialists, and give the building a plan it can act on.

The practical benefit is that the data gets built once. The same verified floor area and clean utility record that drives your compliance position also drives a supply bid, an incentive application, or a solar screening.

Local detail that changes the answer
A 10,000 sq ft threshold
Non-residential coverage starts far lower here than almost anywhere else, so small buildings are frequently covered.
PG&E gates both fuels
One attestation covers the whole property, and until it is in place nothing moves. There is no partial-fuel start.
A 2030 renewable requirement
Commercial buildings over 50,000 sq ft face a 100 percent renewable electricity obligation, which is a supply planning question.
The services behind this page

How we start

Deadline work first. Everything else on your schedule.

1
Position review
Coverage, current data, floor area, and what is outstanding.
2
Close the compliance gap
Filings, verification where it applies, and any notice response.
3
Review energy supply and procurement
No retail choice here, so we review rate class, tariff fit and billing errors instead.
4
Screen the opportunities
Incentives, solar, audits, and measures that also improve the compliance position.
5
Manage it forward
One point of contact, one set of numbers, and reminders that arrive before the deadline.
Why now

Three layered obligations and one utility gate.

San Francisco combines a very low reporting threshold, a rolling audit cycle, and a 2030 renewable electricity requirement for larger commercial buildings. Each one has a different clock.

All of them depend on utility data, and because PG&E serves both fuels the attestation is the first thing we do rather than something we get to.

Received a letter?

What a San Francisco notice usually means.

San Francisco letters are usually about one of three obligations.

Send us the letter
Benchmarking non-compliance
The May 1 annual report is missing. Coverage starts at 10,000 sq ft for non-residential, which catches buildings that assume they are too small.
Audit or renewable electricity notice
A commercial audit is due on your rolling date, or the 2030 renewable electricity requirement is being flagged for a larger commercial building.

Send us the letter itself, not a summary. We read it for the six things that decide the response: who sent it, which building and identifier it names, what period it covers, what it says you failed to do, the cure date, and whether it is a first notice or an escalation. We never quote a running penalty total, and we cure first, then talk to the regulator.

Why Honeydew in San Francisco

One relationship across twenty-six jurisdictions, with local rules tracked rather than assumed.

One accountable partner
We are not engineers and we do not pretend to be. We manage the process, coordinate the right vendors, and own the outcome.
We read the primary sources
Twenty-six jurisdictions, each with its own portal, deadline and enforcement style. We work from the ordinance, the regulator’s FAQ and the covered building list, not from last year’s memory.
Credentialed
Certified Energy Manager on staff, Portfolio Manager specialists, and the credentials the verification work requires.
Built for boards
Most of our clients are condo and co-op boards and the managers who serve them. We present in plain English, on your meeting schedule.
Owners and managers we work with
FirstService Residential Legum & Norman EJF Real Estate Services Comsource Management Barkan Management Howard University Regency Centers Montgomery County Green Bank

Questions about each of these services

With whatever has a date on it. Usually that is the filing or the standard, and the supply and advisory work follows once the compliance position is clean. We would rather earn the second engagement than bundle it.

Yes, and we do it constantly. A clear thirty-minute presentation is often what unlocks a decision.

Yes, a city filing satisfies the California state programme. An exemption does not, which is the same trap as Los Angeles.

As a supply question. It is solvable with planning and expensive as a last-minute scramble, so it belongs in the capital and procurement conversation now.

Possibly. Non-residential reporting starts at 10,000 sq ft in San Francisco, which is the lowest threshold in any jurisdiction we work in.

Commercial audits run on rolling per-building dates rather than one city-wide year, so we confirm yours at intake.

Keep reading

The pages that usually matter next for a San Francisco building.

Annual filing Benchmarking in San Francisco The annual filing, what is reported, and how we keep the record clean. Performance standard BEPS in San Francisco The performance standard, the pathways, and what the exposure really is.
What is BEPS? All Honeydew services Every region we serve Latest rule changes on the blog

One call, and you will know where you stand.

Coverage, deadlines, and what is worth doing first. No obligation.

202-670-9625 Send us the address
Start with the building

Tell us what is on your plate. We will help you sort it out.

A notice, a deadline, a portfolio, or simply a question. You do not need to have it organized before you call.

202-670-9625
Monday to Friday, and yes, a person answers.

Thank you. It is on its way.

Your request has been saved. An advisor will reply, usually the same business day.

Send us the details

Everything here is optional except a way to reach you.

Goes to [email protected]. We do not share your information or sell it to vendors.

Privacy choices

Choose which optional tools may run. Contact forms and our standard phone number remain available.

Privacy details